Selecting a level of development
LOD 300, 350 and 400 — choosing the level your project stage actually requires, and what over-specification costs.
Guidance on BIM standards, drafting workflows, coordination and construction documentation for architecture, engineering and construction teams.
Latest articles
Technical guidance shaped by the standards, workflows and coordination requirements behind production delivery.
Articles are currently being prepared.
Send us your standards, scope and required deliverables. We will confirm the appropriate workflow, programme and fixed price.
Where coordination workflows break down, what an office standards document should contain, and how to scope external production so it does not drift.
Publication begins shortly. To be notified as articles are released, contact us →.
ARTICLE INDEX
LOD 300, 350 and 400 — choosing the level your project stage actually requires, and what over-specification costs.
What an office standard should contain, and how to derive one from completed projects when nothing is written down.
Nine common causes of a slow model, ranked by the time each one wastes.
Where to next
The standards these articles discuss, the services they apply to, and the work that resulted.
Send one sheet, sketch or point cloud extract. We produce a sample deliverable to your standards at no cost.
Practical perspectives on BIM, CAD, coordination, documentation and production workflows — written for architecture, engineering and construction teams.
01 · Featured Article
02 · Knowledge Library
What an office standard should contain, and how to derive one from completed projects when nothing is written down.
Nine common causes of a slow model, ranked by the production time each one wastes.
What a stated tolerance means in construction and how to specify one that matches the intended use.
The recurring causes of submittal rejection and the production changes that help eliminate them.
How to define a scope precisely enough that it does not drift once production begins.
The practical minimum for an architecture or engineering firm working to the standard for the first time.
Why automated conversion can become more expensive than redrawing once the file reaches an editor.
Why item count is not a measure of coordination quality and what a useful report should communicate.
How documentation moves from design intent through drafting, coordination, review and final delivery.
See how Vantage applies these standards, workflows and coordination principles to real production work.
Explore Our Services →