
Quantity Takeoff
Measured from drawings or extracted from the model, and issued with the evidence attached.
Reliable quantity and cost data developed from your drawings or BIM model to support planning, procurement and budgeting.
Detail
An estimate that cannot be verified will be discarded by the first party who disputes the total. Every takeoff traces back to its source sheet.
Specialisms

Measured from drawings or extracted from the model, and issued with the evidence attached.

Issued with assumptions, exclusions and a value engineering options schedule.


“The marked-up takeoff made every quantity easy to trace and review with the project team.”
Nathan BrooksPreconstruction Manager
Measurement and cost data produced from drawings or BIM models, with assumptions and evidence attached.
Ready to discuss your estimating requirements?
Get a QuoteSpecific deliverables are confirmed in your agreed scope.
Sign an NDA, then share your project requirements and files.
Agree the scope and standards, then review a pilot before production.
Visuals progress through agreed review checkpoints and documented quality checks.
Review deliverables and in-scope revisions before final handover.
Yes. Your rate library is the default basis; published databases and supplier quotations are used only where you direct.
CSI MasterFormat, UniFormat, NRM2, SMM7 or POMI — or your internal template.
Yes, with quantities reconciled to the model and any discrepancy against the drawings reported.